ARCHIVE / 00

History is part of the system.

Development has moved through pauses, restarts, and a change of foundation. This record keeps the current work legible.

Project Start

Initial development began on HORUS OS as an independent Linux distribution project.

First Pause

Development paused after approximately two months of initial work.

Development Restart

Project resumed with refined direction and updated architectural approach.

Second Pause

Development paused again as project direction was re-evaluated.

Brief Restart

Short development period with focus on core infrastructure.

Project Shelved

Development temporarily shelved during May 2026.

Arch-Based Direction

Project transitioned to Arch Linux foundation during 2026. Current engineering milestones reflect this direction.

CURRENT / 01—06

Current engineering milestones.

Six milestones tracking core infrastructure development. Progress is based on verified completion, not target dates.

Verified complete01 / 06

Arch ISO Build Pipeline & Boot-Path Validation

Establish repeatable ISO generation, validate boot sequence, and verify live-session initialization.

Verified complete02 / 06

Graphical Live-Session Integration & Desktop Runtime Validation

Integrate desktop environment into live session, validate graphical boot, and confirm runtime behavior.

In progress03 / 06

Installation Workflow Engineering & System Provisioning

Develop installation workflow, implement system provisioning logic, and validate installed-system boot.

Planned04 / 06

Limine Bootloader Integration & Boot-Entry Orchestration

Integrate Limine bootloader, configure boot entries, and validate boot-time behavior.

Planned05 / 06

Visual Identity Integration & Distribution-Level Desktop Refinement

Apply visual identity system-wide, refine desktop integration, and validate brand consistency.

Planned06 / 06

Release Qualification, Compatibility Assessment & Quality Assurance

Perform release qualification testing, assess hardware compatibility, and validate distribution readiness.

READ THE STATUS

2 of 6 milestones are complete. Dates are not assigned to planned work.